WHAT DO I HAVE TO DO BEFORE INSTALLATION?

You must acclimate your laminate boards for 48 hours in the room where they will be installed, before you install them. That means open the boxes and let the laminate boards adjust to their surroundings. Installation should take place at room temperature of at least 65°F (15°C). A floor surface temperature of 59°F and an overall room temperature of 64°F must be ensured before, during and three days after the installation.

© Copyright 2017 Robina Flooring. All Rights Reserved

CONTACT US

+6010 891 0828

NO.2, JALAN T.S.B 8, 

TAMAN INDUSTRI SG. BULOH,

JALAN SUBANG, 

47000 SELANGOR DARUL EHSAN, MALAYSIA.

  • Facebook Social Icon
  • Twitter Social Icon
  • Google+ Social Icon
  • YouTube Social  Icon
  • Pinterest Social Icon
  • Instagram Social Icon

Editor: Yu